KTZ Express resumed delivery of metal rolling from China to Russia
The next train, consisting of 84 containers with a total weight of 2,400 tons rolled iron, was sent at the end of March from the Urumqi station (XUAR, PRC) through the Kazakhstan border crossing Dostyk towards the station Murom-1 (RF).
Further, the cargo will be delivered to the LLC RusTechnologii Murom, which is the largest producer of galvanized steel in Russia.
The length of the route along the track 1520 is 4300 kilometers, which the accelerated train overcame in 7 days.
In the future, the train will depart on a regular basis twice a month.
The partner of JSC KTZ Express in this project is PJSC TransContainer.